On Thursday last week I was up during budget estimate debates to ask the Minister of Energy, Mines and Petroleum resources a series of questions pertaining to BC Hydro, the standing offer program for clean energy, and Site C. As you will see from the exchange (reproduced in text and video below), I was quite frustrated with the lack of substance in the answers I received to the questions I posed.


Video of Exchange



Text of Exchange


A. Weaver: A thank-you to the member for Shuswap for his thorough canvassing of the issue of the Zapped report. I’d like to pick up on this a little bit. The member was able to canvass the procurement process, which I was as equally troubled by as the member was. The answers drawn from that were very troubling.

What I’d like to do is come up to some of the comments that are in the report and fill in some additional detail, building on what the member for Shuswap has asked. For example, the report noted that the average surplus per year that B.C. Hydro acquired was “9,500 gigawatt hours of blended energy.” However, the Clean Energy Association of B.C. highlighted that the average surplus that B.C. Hydro recorded was closer to 1,532 gigawatt hours. They base this off the number shown on B.C. Hydro’s website.

My question to the minister is: could the minister confirm that B.C. Hydro actually did acquire, as stated in the report, 9,500 gigawatt hours per year of unneeded energy?

Hon. M. Mungall: Sorry for the length in trying to sort this out, but I just want to make sure that I completely understand what the member is asking and understand the analysis and the expertise those who are sitting with me have to offer.

Basically, what happened was that the way the previous government defined what B.C. Hydro could do in being self-sufficient is what drove what ultimately would be this surplus — B.C. Hydro having to buy power that was surplus to their needs. As I stated earlier for the member’s benefit, shutting Burrard Thermal, saying that only very modest upgrades to existing assets plus Site C were allowed…. That all constrained B.C. Hydro’s ability to meet the demand of its customers throughout the province.

So it forced B.C. Hydro into a position where they had to buy power from private power producers, which therefore created this market for private power producers to develop their generation assets and then sell that power back to B.C. Hydro. As I’ve stated earlier and as Mr. Davidson pointed out in his report, much of that power was expensive and was also coming on line at the wrong time of year — namely, during the spring freshet, when B.C. Hydro just didn’t need it.

A. Weaver: I shake my head every time I get an answer. The minister is saying what the report concludes, but the report assumed the conclusion that it concluded. So it’s kind of circular to suggest that the report is concluding that the surplus required them to go to the IPPs. It’s just circular logic.

I’ll ask another question, then. What is the total surplus energy that is produced in British Columbia each year, on average? Simple question.

Hon. M. Mungall: From year to year, the total that the member is asking about does vary. But we can give him that, on average, it’s 4,000 gigawatt hours per year.

A. Weaver: Does that report also note that the value for energy would be its market value? The member for Shuswap talked about this — mid-C, basically.

I understand that since 1989, British Columbia Hydro has entered into quite a number of long-term contracts. Can the minister confirm that B.C. Hydro buys energy through long-term contracts that don’t follow the mid-C market value rate?

There’s no excuse for this delay. It’s a simple yes-or-no answer. I asked the question: can the minister confirm that B.C. Hydro buys energy through long-term contracts that don’t follow the mid-C market value rate, yes or no? It’s not a complex question.

Hon. M. Mungall: In every estimates, I feel like we go through this with the Leader of the Opposition. Honestly, Member, I’m just doing my best to make sure that I provide a fulsome answer. I’m not trying to delay or scoop up any of his time. I’m just trying to be fulsome. So please, just give me a moment to be able to do that for you.

In that, B.C. Hydro does buy energy, as he’s asking, at mid-C price. Only one project, though, as pointed out in Mr. Davidson’s report. Yes, B.C. Hydro does have contracts, many multi-year contracts, that are for above the mid-C price. That’s exactly the point of Mr. Davidson’s report, because the IPPs are all well above mid-C price. We know that.

For example, a lot of the IPPs are coming in at $100 per megawatt hour. Compare that to what Alberta is now doing for their wind projects, at $40 per megawatt hour. So you can see that there’s still quite a difference, even if we’re not going to be comparing it with the mid-C price. But I do want to highlight that the mid-C price is a benchmark for what ratepayers can get for surplus energy when B.C. Hydro has to sell that.

A. Weaver: Again, I shake my head. I ask a question, and I get a response to a question I didn’t ask. I was asking about long-term mid-C market value rates. Maybe the minister can say why Mr. Davidson didn’t consider these. I’m not talking about the IPPs. I’m talking about whether or not B.C. Hydro, since 1989, long before the IPPs were ever even talked about, has bought energy through long-term contracts. Yes or no? And if so, why were they not discussed and mentioned at all in the Davidson report?

Hon. M. Mungall: Yes, B.C. Hydro does have long-term contracts. I did mention that in my previous answer. I am sorry I don’t have the report right in front of me, but I do recall Mr. Davidson talking about some of those. I did already mention, as well, that he noted that there is one project that does have a long-term contract for mid-C prices.

A. Weaver: In the Zapped report, there was a line that caught my attention. It was based on the interviews. The report claimed that the 2007 energy plan was created with the intent to “create the appearance of an energy shortfall.” It is remarkable that an independent consultant would provide value-added commentary like that in a so-called independent report. I’m shocked, to say the least.

Anyway, I continue. However, I was under the impression that much of the 2007 energy plan — and frankly, I was here and working with government at the time on that energy plan — was designed to get British Columbia to be self-sufficient in its energy production.

Can the minister confirm that prior to 2007, there were several years of high net energy imports and a strong domestic load growth projected? It’s a simple question. Prior to 2007, can the minister confirm that there were several years of high net energy imports and strong domestic load growth projected?

Hon. M. Mungall: The member wants yes-or-no answers, so I’ll just say yes, and I will not endeavour to seek further information unless he specifically asks for it. Pardon me for doing that in the past.

A. Weaver: I’m going to continue on this theme, because there are a lot of assumptions that have been stated here as facts and conclusions from the report that were not conclusions. They were assumptions. Here are some others. I’m going to discuss the issue of importing power.

The minister has said that we have a surplus of energy produced over the last number of years. However, the large fluctuations that happen from year to year, based on water levels, can dramatically change how much power we produce.

In B.C. Hydro’s compliance filing form F17-19 revenue requirement application, it stated: “In the past ten years, there has been a difference of 12,000 gigawatt hours between low and high water…requiring surplus sales or market purchases.” There’s a slight missing word in there.

Anyway, the reality is the 12,000 gigawatt hours between high and low waters is the key number there. It’s a very big difference.

My question to the minister is this. I’d like to know if we were a net importer of energy in British Columbia over the last year? Yes or no? Or in any of the other previous years? Yes or no?

Hon. M. Mungall: Yes.

A. Weaver: Can the minister please tell us how much B.C. Hydro paid to import energy in March or this past quarter?

Hon. M. Mungall: We spent $54.9 million net importing energy in March.

A. Weaver: So we spent $54 million importing energy. We had too much energy surplus, that we didn’t need these projects. Very interesting.

Can the minister please provide how much power, on average, we have been importing over the last ten years?

Hon. M. Mungall: I did say that I would only provide the yes-or-no answers that the member wanted and the very short answers that he would like, but I feel like I’m doing a disservice to the British Columbians who might be watching this, as well as to the member to not inform him that the reason why there was an import of energy recently is due to low water levels.

For example, in my riding, I can look not too far down the hill and see exactly what those water levels are because the Kootenay Lake is, essentially, a reservoir for B.C. Hydro, along with Duncan Lake and so on. So those are the parts in my riding.

But generally, over the last decade, we’ve actually be exporting energy, not importing it.

A. Weaver: I’ll come to that shortly — maybe now. Pushing on, first I’d like to ask… The $54 million — what was the price that you were selling it at in March of this year?

Hon. M. Mungall: I think the member might have misspoken, but he can correct me if that’s not the case. I think he meant what we were buying it at, the price that we were buying it at.

A. Weaver: Sorry, yes.

Hon. M. Mungall: Okay. In March, we were buying it at $57 per megawatt hour, Canadian.

A. Weaver: So the average price was $57 per megawatt hour.

I understand that Powerex is the key trading arm of B.C. Hydro. Well, it is a trading arm of B.C. Hydro, but I know it’s separate. It imports and exports power when it’s financially advantageous to do so. It brings money directly into the provincial coffers — a good thing, I would suggest.

However, the power we import comes from Alberta and the U.S. I’m concerned that much of it, if not all of it, is brown power, despite the rhetoric we hear from this minister. That’s power created by burning natural gas or coal, which emits high levels of CO2. Over 80 percent of Alberta’s electricity is coal- or gas-generated. In Washington state, there are over a dozen coal and natural gas plants. Can the minister confirm that the majority of the power that B.C. Hydro, via Powerex, imports to B.C. is from natural gas– and coal-fired plants?

Hon. M. Mungall:  I appreciate the member’s concern about exactly what type of power is coming to B.C. I know that he knows that electrons aren’t tagged one way or another, except in the situation with the Canadian entitlement, which is the Columbia River treaty. When we’re getting that power coming up from the United States, that is hydroelectric power. We know that that particular power is not generated by using coal or natural gas. In terms of in March, it’s hard to say whether it was natural gas–fired or coal-fired if it was not the Canadian entitlement, power that we were purchasing at that time. We were purchasing at that time, as I said earlier, because of low reservoirs.

That being said, it’s important to note that in Alberta, they’re increasing their wind generation. Solar is increasing as well in Alberta. Wind and solar as well below the 49th parallel is also increasing.

As more renewables come on line, we are obviously trading in more renewables. What I would say is it may be not the case for March, but in general, when we are buying power from other jurisdictions, it’s normally when they have an excess of wind, or an excess of solar, and they’re putting that on to the grid.

What is likely coming into B.C. is power generated from those avenues.

A. Weaver: I’m getting very close to calling for the resignation of this minister, hon. Chair, based on the lack of substance of these answers. This is a minister who clearly does not understand the file, clearly does not understand how electricity is produced and shipped. This is a minister who is responsible for the oversight of B.C. Hydro’s next review? It’s just shocking.

Let me explain to the minister how the power comes through. Coal and natural gas plants typically run, not on natural gas, 24-7. Powerex recognizes that, at night, coal power, which is going 24-7, is really cheap, because demand is low. But it doesn’t need to actually need to sell the power from it’s hydro dams, so it saves that for the day. We’re importing coal power and making money by shipping off clean power.

The minister should know that. The minister should not be trying to imply to British Columbians that somehow we’re buying wind and solar, intermittent sources. But we’re not. It is shocking, just shocking, that we’re hearing this in estimates today. I’m stunned. I almost feel like sitting down. I cannot believe that this is what we’re hearing.

Anyway, I’ll continue. I think it’s fair to say that based on these aspects of how the U.S. Pacific Northwest and Alberta generate their power, particularly their low-cost power, that the majority share of it will come from coal and natural gas. I think that’s safe to say.

Can the minister give an estimate of how much emissions were generated based on B.C.’s import of this brown power over the last year? What the emissions input…? That’s leakage into our province from emissions, because we’re buying brown power in this province.

Hon. M. Mungall: The Ministry of Environment does work with Powerex to calculate the carbon intensity of the energy that British Columbia imports. I’m happy to get that number for the member.

In terms of my previous answer that has clearly sparked outrage from the other member, I want to be clear that I’m just trying to share information that is coming to me from our experts at B.C. Hydro who are working on these issues every single day and trying to share that with the member so that he has a better understanding but also a bit of comfort in terms of where we are getting our electricity from when we are importing. The world is changing, as we know. We know that coal-fired plants are starting to be shut down in favour of renewables or lower GHG emission plants. I’m just wanting to share that information with the member.

A. Weaver: I so very much appreciate the minister providing the information on a file that I’m not certain she understands, frankly. I’m not certain she has a grasp of this most important file in our province, based not on the answers of the last question but the answers that I’ve been getting throughout estimates here, both this time and last time and in question period — time after time after time.

And to throw the good people of B.C. Hydro under the bus, to suggest that she is conveying the information to me about wind and solar in the U.S. from the good people at B.C. Hydro — that’s just ludicrous.

Coming to energy self-sufficiency. In 2012, the provincial government changed the regulation that forms the basis of electrical generating and planning criteria that B.C. Hydro uses. Historically, the definition of “critical water conditions” was used to ensure that there would always be a certain amount of power available. The previous government changed that metric. Instead of using critical water conditions, they now use the average water conditions. Overnight the amount of energy that B.C. Hydro could reliably produce went up by 5,600 gigawatt hours, through the definitional change there.

With climate change and variability predicted to continue, this change to using average water conditions for planning does not seem to be very prudent. Instead of being self-sufficient when a drought happens, we could be faced with a real possibility of importing large amounts of power if such a drought were to happen, because of poor planning.

Has the minister considered the impact of using average water conditions to forecast energy generation potential? I can maybe do two at once: given the variability in water flows this province is facing, is it prudent to continue to use average water flows as the basis for predicting the amount of power that we can generate?

Hon. M. Mungall: The member’s question is if using average water flows for predicting energy generation is good, if it’s the right way to go. I think that is a very important question, and it’s actually one that we’re going to be looking at in phase 2 of our B.C. Hydro review. It is going to, ultimately, feed into the integrated resource plan, the IRP.

As we continue on in this process, I very much appreciate the member’s knowledge on this file. I very much appreciate the member’s expertise in this area and that he is seeking more information. I am doing my best to offer it to him. I know he doesn’t like me personally, but I don’t know that personal attacks are helping the estimates process at all.

Point of Order

A. Weaver: May I ask that you please, as a point of order, ask the minister to withdraw that? That is outrageous. This has nothing to do with personal and everything to do with lack of substance in the answers that we’re getting on a file that’s very, very important. I find it offensive that the minister would stand and try to deflect from the criticism and concerns I and my friends here have had on the answers that we’re getting and turn it into an ad hominem.

The Chair: I think that in the best interests of everyone, we should take a five-minute break. So I’m going to recess the committee for five minutes.

The committee recessed from 3:21 p.m. to 3:49 p.m.

Point of Order
(Chair’s Ruling)

The Chair: Prior to the recess, the Leader of the Third Party raised a point of order relating to comments made by the minister. Upon consideration of the point of order and the circumstances leading to it being raised, I note that both the Leader of Third Party and the minister expressed some frustration with this debate.

I recognize in this committee room that any criticism within the debate can escalate and be amplified, particularly in this small setting. So it’s my expectation that we can now resume debate on Vote 22 with all members treating each other with respect.

Debate Continued

A. Weaver: I’m going to move to final questions on Site C. As Site C progresses, we learn more and more about the shady nature of what occurred and continues to occur to get the project past the point of no return.

Between 2016 and 2018, no fewer than 38 contracts were directly awarded, avoiding a more transparent and competitive tender process. Close to $90 million has been awarded from B.C. Hydro to a variety of companies, some with close ties to the official opposition, with respect, and some that are simply numbered companies. Transparency is lacking, and awarding public funds to numbered companies is, frankly, somewhat suspect.

Site C is a huge undertaking that has already cost the citizens of British Columbia an enormous amount. For contracts to be awarded directly, without due process or justification, frankly, I would argue, is unacceptable. Can the minister please explain why the awarding of direct contracts like this was occurring under her watch?

Hon. M. Mungall: The percentage of contracts that are direct award is 3 percent of all the contracts since July 2015 that B.C. Hydro has procured. Many of those contracts that are direct-awarded are to Indigenous businesses.

The numbered company that the member spoke of…. That direct-award happened in January 2017, prior to the 2017 election. It’s pursuant to B.C. Hydro’s Aboriginal procurement policy, and it is for road remediation and various erosion and sediment control works.

That company was designated by the Doig River First Nation as their business partner to complete the work. As I said, it falls in line with B.C. Hydro’s Aboriginal procurement policy as well as their IBAs.

A. Weaver: The government announced a Site C project assurance board to oversee the project and ensure it stays on time and on budget. But what is the point, frankly, of having a private board issue reports that no one can have access to, other than government?

When the government was in opposition they rightly criticized the previous government for excluding Site C from review by the BCUC. However, now that they’re in control, they’ve set up their own board to oversee the project — a board that is not accountable publicly, a board whose members were handpicked and a board that is anything but independent. I understand that even a year after this project assurance board was created, the government has still not determined if the public will be privy to what it’s reporting on. Can the minister please let us know if the project assurance board will have any accountability to the public?

Hon. M. Mungall:  I know the member recalls that our government did have the B.C. Utilities Commission review the Site C project, and it continues to review quarterly reports about Site C. Those reports are reviewed and approved by the public assurance board — PAB is the acronym — and I would mention that PAB is accountable to government, and it reports regularly to Treasury Board as well.

A. Weaver: My question was not that, hon. Chair. My question was: can the minister let us know if the project assurance board will have accountability to the public — yes or no?

Hon. M. Mungall: I think the member may have a different view of how that accountability occurs than it currently does. Perhaps he would like to lay out what he thinks might be a better strategy or a better process than what we have right now, which is going to Treasury Board, accountable directly to government as well, in that it is reviewing all of the quarterly reports on Site C that are ultimately delivered and deposited with the B.C. Utilities Commission.

A. Weaver: Well, I’m not the minister. Therefore, I’m not able to answer the question as to whether or not the reports and recommendations written by the project assurance board are made public or not. That is really a question of her ministry. It’s not for me to say we would…. Yes, if I were Minister of Energy, we would make those reports public if there are such reports. That’s all I’m asking.

Is there going to be…? As I pointed out, the public assurance board was created by government, appointed by government. There’s nothing reporting out from government. It’s a simple question. Will there be a public transparency component to the assurance board?

Hon. M. Mungall: I appreciate that maybe the member would like to see reports put on line or so on. The reports that are made to the public are the quarterly reports on Site C that are approved by the public assurance board and then delivered to the B.C. Utilities Commission. Those reports are available to the public on their website.

A. Weaver: We’ve heard directly from residents on the ground who are monitoring the progress of the dam and the work on the diversion tunnels. It has been on hold for quite some time now, I understand. Can the minister please provide an update as to what is going on and if this is further delay to the construction schedule?

Hon. M. Mungall: There was a two-week stand-down. This was because WorkSafe was investigating an electrical incident that happened with a worker. The worker is fine — so that everybody knows that he’s fine — and that’s very good news for that worker, but it required a two-week investigation by WorkSafe following up on that.

The tunnelling does still continue, and Hydro is still projecting to achieve river diversion by September 2020.

5 Comments

  1. mark meiers-
    May 19, 2019 at 9:09 am

    andrew weaver has not a leg to stand on-andrew weaver has thrown all bc residents under the bus in reguards to site c-andrew totally abandon northern bc and the site c issue in favor of other pursuits-thats not what we voted for and andrew should be held accountable for his lack of integrity on the site c issue-i firmly believe all parties were told that site c was going ahead reguardless of any outside findings and whatever party was elected would carry on with site c no matter what-this seems to be true now–the total crooked corruption starting with the federal govt-(trudeau had to sign off on the federal permits-snc-lavalin needed this to carry on with site c)-should raise a red flag along with the total crooked corruption of the bc govt of the day and crooked corrupt bc hydro is mind boggling-people should start to call this crooked corruption for what it is instead of white washing it—its ok to call a spade a spade–crooked corporate and political greed is all thats carrying site c forward so lets call it that instead of pussy footin around–mark meiers charlie lake bc

    • May 21, 2019 at 11:45 am

      Thanks for your feedback. The BC Greens have not and do not support the Site C project. But there are 83 MLAs in the legislature who do so I am not sure how the three of us could stop it. Do you really think an election will lead to a different result? I am not so sure unless we can get more MLAs to support us. You should be asking the NDP MLAs why they at one time rallied against Site C and now baled on that promise.

  2. Randal Hadland-
    May 13, 2019 at 10:01 pm

    One detail that Minister Mungall got partially right was that the NDP did have the BC Utilities Commission look at some of the issues arising with a Site C dam. The questions that Mr. Weaver asks of the energy minister were answered in evidence and in the report from the BCUC hearing. I don’t know whether it is a serious lack of interest or whether Ms. Mungall is unable to hear anything that doesn’t come from BC Hydro or the prodam instigators of the proposed dam.

    The NDP has definitely declined to reach out for a different perspective than what her advisors are handing to her. It is time to stop dreaming of your philosophy Ms. Mungall and it is time to do a proper assessment of the negative effects of Campbells clean energy act. The contrived and misleading demand forecasts arising from the Liberals restrictions on energy supplies already available, is doing nothing but breaking the bank for every non industry consumer in BC.

  3. May 13, 2019 at 12:47 pm

    I think A. Weaver for pursuing transparency for us on BC Hydro. It seems like there is a cut-off of how and when contracts were awarded before and after the NDP came to power, but BC Hydro is still the same. Given that there are major companies still working on projects like Site C, how soon could there be a Province-wide energy assessment correlated with ecosystem sustainability in times of this changing Climate? We many be sacrificing major components of our species without comprehensive assessments of their values.

  4. Sandra Winfield-
    May 13, 2019 at 11:22 am

    I can see why you’d be frustrated. I was too. Can you tell me why BC does not have their own wind and solar power? Thank you.