Today in the Legislature I asked the Minister of Energy, Mines and Petroleum Resources what her ministry is doing to encourage the use of our outstanding geothermal resources. Readers of this site will know that since as early as 2014, I have been trying to get both the BC Liberal Government and the present BC NDP government to recognize the incredible opportunity that geothermal energy innovation and production offers British Columbia.
Below I reproduce the video and text of our exchange.
A. Weaver: Yesterday I asked the Minister of Jobs, Trade and Technology what his ministry was doing to encourage a strategic approach to transitioning away from the reliance on fossil fuels development in northern B.C. He talked about the importance of innovation. I agree. But there are barriers to innovation in B.C., and those barriers lie in B.C. Hydro.
Take the Borealis geothermal project in Valemount, for example. The member for Prince George–Valemount and I have been trying to get government to recognize the enormous potential for this project to showcase innovation in B.C.’s clean energy sector. British Columbia is the only jurisdiction in the Pacific Rim that isn’t using its geothermal resources. It strikes me as a no-brainer. Community support is strong. Valemount is at the end of an existing B.C. Hydro line, and with Glacier Destinations moving forward, enhanced local power production on an already stretched and often intermittent line will be required.
My question is this to the Minister of Energy, Mines and Petroleum Resources. Could she please explain what her ministry is doing to encourage the use of our outstanding geothermal resources?
Hon. M. Mungall: The opportunity for geothermal needs to be proven in B.C., and there are some companies that are doing just that. They’re working to prove up the geothermal resources that have been identified. Borealis is one of them. As the member will know — and the member for Prince George–Valemount — they received a permit just over a year ago to start doing that work. They actually have a new permit before the ministry. I look forward to seeing the recommendation from the ministry in terms of how to proceed with that permit so that they can do the work that they’ve been doing to prove up this opportunity with geothermal.
A. Weaver: The reality is that on the ground nothing is being done, not because of lack of industry or community support but rather because of cumbersome regulatory barriers and the absence of a champion within this government. Geothermal drilling is being regulated by the Oil and Gas Commission via rules that don’t reflect the practice within the international geothermal sector.
There is no ability for geothermal projects to lever existing federal funds without a strong provincial commitment. Our geothermal resources have the potential to diversify and decarbonize B.C.’s energy systems, provide energy with minimal environmental impact footprint — probably the smallest environmental footprint of any type of resource like that — create jobs and prosperity in northeastern B.C. and provide a showcase for innovation in our clean energy sector.
My question again is to the Minister of Energy, Mines and Petroleum Resources. When will her ministry start streamlining the regulatory process and start encouraging, as opposed to discouraging, British Columbia’s outstanding geothermal sector?
Hon. M. Mungall: My ministry has done nothing to discourage the opportunities with geothermal — in fact, quite the opposite.
Interjections.
Mr. Speaker: Members.
Hon. M. Mungall: I’m not too sure why the Liberals are all worked up about this particular issue, hon. Speaker. It’s not like they ever discovered geothermal when they were in office. The reality is that there’s quite a bit of science here that needs to be done, and it’s about a process in terms of actually making sure the resource is sufficient enough, hot enough, to actually generate electricity from it. That needs to be done. And that’s exactly what Borealis and other companies who are interested in doing this work in British Columbia are given the opportunity to do. I’m very glad that they’re here and making those investments, and I look forward to working with them going forward.
Today in the legislature, Shirley Bond, the MLA for Prince George-Valemont and I quizzed the Minister of Energy, Mines and Petroleum Resources about the delays involving approval of a permit expansion for Borealis GeoPower.
As I have discussed numerous times in the past, British Columbia is the only jurisdiction throughout the entire Pacific Rim that isn’t using its geothermal resources. As noted in a 2014 Canadian Geothermal Energy Association (CanGEA) report,
Below I reproduce both the text and video of the exchange between Shirley Bond, Michelle Mungall and me. As you will see from the discussion, I was troubled by some of the responses we received from the Minister. Nevertheless, the overall conversation was generally positive and bodes well for the future of this particular geothermal energy project.
S. Bond: I’d like to spend a couple of minutes talking about a project that is incredibly important when we’re talking about clean energy in British Columbia.
I’m wondering if the minister can give me a sense of her understanding and the status of the project that’s being suggested by Borealis GeoPower.
Hon. M. Mungall: To the member, I know that she is very interested in this project. It’s in her region. And I’ve been fully briefed on it by staff.
We’re very supportive of this project. I think it poses some pretty interesting opportunities. So far to date, in terms of geothermal production, which is what Borealis is, there hasn’t been any exploration that has proved up to be viable, but Borealis is doing that exploration. They’re confident that they can actually prove a viable geothermal source, and so we’re very supportive of them doing that work.
S. Bond: Thank you very much to the minister for her response. I appreciate that.
Certainly, in my riding, and particularly in Valemount and other parts of the region, the opportunity to diversify the economy is absolutely essential. One of the things that’s critical to that is a secure supply of power, because it’s very hard to attract industry and others if you can’t guarantee them a stable source of power. And there has been ongoing and…. I admit, over my 16 years as the MLA for this area, secure and stable power has been a significant issue.
So looking to diversify the economy, looking to create jobs — not a big number, but in our riding, you know, even one new job matters. So this project being proposed by Borealis GeoPower is a geothermal project. I have, certainly, over the course of a number of ministers, talked about the importance of looking at the portfolio, including alternative energy sources like geothermal.
The concern I have is that there continues to be a need for a permit expansion on the Canoe Reach geothermal project. I know that the proponents have been here. I have actually met with the leader of the Green Party about this project. And apparently, the permit is sitting somewhere waiting for approval.
Can the minister perhaps explain to us if and when that permit for expansion may be approved?
Hon. M. Mungall: As I said earlier in my response, our ministry is supportive of the project. We see a lot of potential. We’re excited about the opportunity for geothermal to potentially be proved up in this province. To date, it has yet to be done. We’re glad that Borealis is looking to do the work.
The ministry is actively engaged with them and is working with them throughout that permitting process. As the minister knows, there are statutory decision-makers involved in those stages. So my understanding at this point is that their applications are under consideration, and they are actively working with the ministry, and the ministry is actively working with them.
S. Bond: I appreciate that answer. I just don’t feel overly encouraged by it.
I appreciate the support for the potential of the project.
I think it is essential, as we’re having a major discussion in our province about clean energy, particularly in a region of the province that really needs to be able to diversify their economy.
I just want to walk through some of the…. I’m the first to admit that this permit was provided to the previous government — us, basically. This is not a short-term issue. In fact, the initial feedback about this application was provided in February of 2017. That was nine months after the original request from the Ministry of Energy, Mines — where it was stated that the ministry had completed the pre-tenure referral process. However, they were waiting, at that time, for the development of regulations. That wasn’t completed. The writ period came, the election came, and the new cabinet wasn’t formed until July 18.
This company, which is working very hard to…. It is one of the projects where I’ve seen significant support in my region, where people have stepped up and said: “This is something that we would like to see happen.” The delay has continued. The last information that certainly the company received was that the permit request was “with cabinet operations and the minister.”
It sounds to me like the permit is ready to be signed. I’m wondering if the minister can at least agree today that the ministry will look at where the permit request is and when it will be signed.
Hon. M. Mungall: I appreciate that Borealis and the member for the region would like to see this moving forward in a timely manner. I heard her comment about the length of time it already took under her government, that there was a nine-month time frame. If she’s wondering if, in the last four months, we’re moving at a more speedy pace, I can say yes.
A. Weaver: I’d like to follow up on the questioning from the member for Prince George–Valemount on this issue of Borealis. I, too, have met — with the member for Prince George–Valemount — several times with the proponents of this project. My understanding is identical to the former minister’s understanding, in that the permit is actually in the OIC process, waiting for signature.
My question would basically repeat, initially, the question made by the member: will the minister commit to actually looking, in terms of what’s in the queue in the OIC approval process, to determine whether or not she can expedite the signing of this permit? It is — I believe, as the member does — in her jurisdiction, not in the jurisdiction of a statutory decision-maker.
Hon. M. Mungall: I should let the member know that, due to the oath that I signed, I’m not at liberty to discuss cabinet agendas.
A. Weaver: I accept that as an answer. I do bring it to notice, though, as the member opposite did, that the answer that we did receive was one that, I would argue, is not the relevant answer, because permitting is not before a statutory decision-maker. It is before cabinet as we speak, in my understanding.
I’m coming to a question, then. This particular project, this Borealis project, is the at the end of a transmission line in a community, Valemount, that’s subject to brownouts already, at the same time as there’s an approval process for the development of a major ski resort, Glacier Destinations.
This is a community where the Simpcw Nation wants this to happen. Valemount wants this to happen. The company wants to develop. The holdup is primarily, almost exclusively, in the minister’s office. Will the minister commit to actually looking at this project so that we don’t lose yet another investment — not of taxpayer money but investor money — in a community that’s dying to get this forward?
Hon. M. Mungall: I’m glad that we have members from both of the opposition parties — the official opposition and the Green Party as well — who are supportive of this project. As I mentioned to the member for Prince George–Valemount, government is very supportive of this project. We have to do our due diligence. That’s government job, as a regulatory body. I believe members of the Green Party were just asking questions in question period to that effect — that government has a job to do in terms of a regulatory function. We are doing that.
The Borealis project — as I’m very happy to see that members from all sides of the House agree — is a positive project and a good opportunity for British Columbia, if they are able to prove up any exploration that they’re able to do of the geothermal resource. As I mentioned, there has been past exploration of geothermal resources in B.C. that have not been able to prove up a sufficient resource to generate electricity. We’re hoping that that may change with Borealis.
That being said, as I’ve said to members already, I cannot discuss cabinet agendas, but the due diligence around this project has been done. Our ministry, our government, is very supportive of it, and we look forward to continue working with them into the future.
A. Weaver: I’m surprised that the minister would suggest that exploration has been done in geothermal that has not proven up a resource when B.C. Hydro has done precisely no exploration on geothermal and companies associated with the Canadian Geothermal Energy Association have done exploration to say that we have an enormous potential. In fact, we are only the jurisdiction in the Pacific Rim that does not have a geothermal capacity — not because we don’t have it but because there has been no will to develop it.
I come back to this issue of Valemount. Valemount is at the end of a transmission line, a transmission line that leaves Valemount to brownouts all the time in the winter. B.C. Hydro has to upgrade that transmission line, and there’s a massive capital cost involved in doing that. B.C. Hydro produces power, is the sole purchaser of power and also is responsible for the development of transmission of power.
My question to the minister is: how does she ensure that the transmission component of B.C. Hydro actually talks with the part of B.C. Hydro that purchases power so that they recognize that the cost benefit of developing up transmission line power is there to avoid the unnecessary expense of capital to upgrade transmission lines? If you upgrade the power at the end point, you don’t need to bring up the transmission line to give more power to the end point. Will she commit to ensure that B.C. Hydro starts to talk between the different branches so that the actual full capital cost of moving forward is recognized when this is done?
Hon. M. Mungall: I just want to address something that the member said before I get to the actual answer of the question. The member said that B.C. Hydro had never done any exploration of geothermal. That is actually not the case. Let me take this opportunity to make sure he is aware of what happened in the 1980s.
B.C. Hydro actually explored a site at Mount Meager, as part of the federal geothermal program that existed in the 1970s and 1980s. They drilled dozens of holes to understand the temperature at that location. They drilled three production wells to attempt to find commercial resource. Unfortunately, they had no commercial success.
They spent about $25 million doing this activity, and the result was that there was just not enough steam or water to move into full electrical production. So I just wanted to make sure the member was aware that, actually, that work has been done by B.C. Hydro. I should also mention that further work has been attempted since then in that site, but yet with the same result.
In terms of the transmission that the member asked about, everyone is in agreement. Whether it’s B.C. Hydro or whether it’s the ministry, we all agree that there are definite benefits and reliability to the transmission site should Borealis be successful and be able to prove up this resource.
Again, I feel like there’s a little bit of a characterization from members opposite that somehow this government isn’t supportive of the Borealis project when in fact we actually are. I’m very pleased to see that that support is shared by all parties in the House.
A. Weaver: I’m sorry, my last question. I just to want to comment on the statement about Mount Meager.
Mount Meager was done in the 1980s — one location. There has been an entire report published by the Canadian Geothermal Energy Association in 2014 outlining the myriad places in British Columbia where geothermal capacity exists. To suggest that one study by B.C. Hydro in the 1980s represents a feasibility analysis in British Columbia is misleading. B.C. Hydro has not taken the proactive steps to explore geothermal capacity in British Columbia.
I reiterate. We are the only jurisdiction in the Pacific Rim that has no geothermal capacity — none — and it’s because B.C. Hydro builds dams. That’s what they do. In fact, they’re not actually tasked in their mandate to build geothermal, so why would we expect them to explore it?
I would suggest…. I do appreciate that the minister is supportive of this, but I think it’s important that the minister not dismiss the fact that B.C. Hydro has not explored British Columbia for geothermal capacity. It’s not me saying that. It’s the National Energy Board review of the Site C project that’s said that. It’s the Canadian Geothermal Energy Association report in 2014 that’s said that. It’s submissions to the BCUC process now that said it. So I would suggest the minister recognize that B.C. Hydro has not done exploration of geothermal in B.C. Experts across British Columbia and across North America have said exactly that as well.
S. Bond: Apparently, the minister didn’t feel there was a question there, so I’ll provide another one.
It’s like we have a raging agreement going on in this Legislature. It’s not about divulging cabinet secrets about the agenda, it’s about asking for reasonable explanation to these proponents about when they can expect the permit for expansion to be signed.
It’s a simple question. Can the minister or her staff provide us with some sense…? You know, this proponent and this community…. I appreciate the comments made by the leader of the Green Party. This matters a lot. This has taken enormous consultation. It is a community that is in agreement with this. The minister has said she supports the project. When can we expect to see the signed permit?
Hon. M. Mungall: As I’ve said before, we appreciate the value of this project to the region. We appreciate the opportunity it has to provide for British Columbia, for Prince George–Valemount in particular. That being said….
I appreciate that the member opposite would like a conclusive answer today. She knows the process of estimates. If I was able to provide that, I would have.
I’m not able to provide that for her today, but I will commit that we are working on it in a timely fashion. It’s unfortunate that her government was not able to approve it in such a way. We, however, will be doing that.
S. Bond: I just want to quote from a note that said “we have heard back from a staff member in the ministry on October 13, who said the permit request was with cabinet operations and the minister.” I hardly think that that is timely. We’re well into November now. It’s just a matter of actually sorting out who is going to advocate for that permit to be signed to get the matter completed.
My final question relates to B.C. Hydro. I understand that in a conversation with the BCUC, they are suggesting that B.C. Hydro partner with industry to develop geothermal projects. I’m not sure if the minister is aware of that. If she is, can she also tell me whether or not she has had a conversation with the minister who is responsible for Columbia Power Corp and the Columbia Basin Trust to talk about whether or not the Columbia Power Corp could be included in a discussion about a partnership of that nature?
Hon. M. Mungall: So first off, I just want to state for the record that B.C. Hydro is interested in geothermal and proved-up sources and working with companies like Borealis, should they be successful.
The member’s question was whether I’ve spoken with the Minister of Children and Families, who is also responsible for the Columbia Power Corporation. My understanding is probably coming from a letter she would have received from Borealis. Borealis was looking for funding, is my understanding, from Columbia Basin Trust and perhaps maybe a partnership, is my guess perhaps, with the Columbia Power Corporation in terms of moving forward and seeking some financial support. That is not within my ministry.
To her question of if I’ve had an opportunity to meet with the minister responsible for CBT and CPC, I have not yet to date.
S. Bond: Thank you very much for the opportunity to ask these questions.
As we’ve heard in this House today, Valemount has either the most power outages in the entire B.C. Hydro grid system or is at least one of the communities that has the most.
There is an opportunity with a geothermal project in the Robson Valley to actually do some very significant things, which actually has important trickle-down effects. Growing the economy — hard to do if you can’t say there is a secure and stable power source.
Certainly, as we’ve reviewed this file and met with Borealis, in the community and numerous times here in Victoria, what’s standing between getting to drill on the land and move toward operations is an outstanding geothermal permit.
I would simply urge the minister to advocate on behalf of this — getting the permit signed and getting on with what is an essential opportunity to look at alternative sources of energy in a part of the province that needs them significantly.
Last week I wrote about BC NDP’s Bill 17: Clean Energy Amendment Act, 2020 that proposed amendments to the Clean Energy Act allowing BC Hydro to:
In my blog post entitled Bill 17, Burrard Thermal, BC Hydro self sufficiency and clean electricity, I detailed a series of amendments that ensured:
That blog post, together with my exchange during Question Period with the Minister of Energy Mines and Petroleum Resources on July 15th, provides a comprehensive analysis of why I proposed the amendments. I conclude the post with this:
I have communicated my intention of supporting the bill at second reading to both the BC NDP and the BC Liberals. If the bill fails at second reading, I won’t get a chance to introduce my amendments during committee stage and I fear that its positive aspects will be lost. That is, the preverbial baby will be thrown out with the backwater. The onus is ultimately on my former colleagues in the BC Green Party to indicate whether or not they support the Bill as it stands, or the amended Bill as I have proposed. Under the “good faith and no surprises clause” of the Confidence and Supply Agreement Premier Horgan and I signed in 2017, the BC Greens will have to communicate their intentions to government prior to the bill being called for debate.
In an odd press release and through an an even more odd, and unsupportable amendment, the BC Greens made it clear that this Bill will die on the order papers. And this troubles me.
The press release appears to be tone deaf. The feedback my office received from Indigenous communities has been almost exclusively on the government’s proposed removal of the self sufficiency clause (see my blog and also my Question Period exchange for more details). Yet the BC Greens propose no amendments in this regard and instead make the bizarre claim that more consultation is needed. The BC Greens could have either proposed to support my amendments to remove the self sufficiency clause, which has been sitting on the order papers since July 14, or introduced similar amendments themselves. This would ensure that the very positive aspects of Bill 17 are passed in a timely fashion. They chose not to, thereby ensuring Bill 17 will die on the order papers.
Unfortunately, the BC Greens’ proposed amendment is unsupportable and in my view shows a lack of understanding of the complexities of the energy file. I too heard feedback from stakeholders that the definition of clean electricity was problematic. However, many of the people raising this issue didn’t realize that the existing Clean Energy Act has very similar regulation enabling legislation. My amendments ensured that the existing definition remained in place for clarity.
Below I reproduce all definitions so I can expand upon this:
“clean or renewable resource” means biomass, biogas, geothermal heat, hydro, solar, ocean, wind or any other prescribed resource;
[there is no definition of clean electricity]
“clean electricity” means electricity
(a) generated from a clean resource, or
(b) deemed under the regulations to be clean electricity;
“clean resource” means a prescribed resource;
“clean electricity” means electricity generated from a clean or renewable resource;
(a) generated from a clean resource, or
(b) deemed under the regulations to be clean electricity;
“clean resource” means a prescribed resource;
“clean electricity” means electricity generated from a renewable non-fossilized resource, including biomass, biogas, geothermal heat, hydro, solar, ocean and wind;
(a) generated from a clean resource, or
(b) deemed under the regulations to be clean electricity;
“clean resource” means a prescribed resource;
You’ll see that the government proposed to essentially leave the definition of “clean electricity” up to regulation. My amendments simply reverted the definition to what has been in place in the existing Act for more than a decade.
The BC Greens basically took the existing definition in the Clean Energy Act and added “non fossilized resource”. While at first glance this might seem sensible, it is problematic for a number of reasons:
1) “non-fossilized resource” is not defined in the bill.
2) Their definition of “clean electricity” may in fact preclude aspects of the establishment of a hydrogen economy. One of the main ways to generate hydrogen is to use steam-methane reformation and partial oxidation to strip it from methane molecules.
3) Despite the BC Green claim, leaving in: “clean resource” means a prescribed resource means that the definition of clean electricity and clean resources is not in fact stronger. It is, ironically, weaker.
In summary, it appears to me that rather than doing what is right and ensuring that the key aspects of the bill are retained while more work is done on the self sufficiency clause, as I proposed, the BC Greens have chosen to introduce 11th hour politically-motivated amendments as a face-saving exercise.
I am profoundly disappointed in the BC Greens for forcing the baby to be thrown out with the bathwater on Bill 17. As I noted earlier, under the “good faith and no surprises clause” of the Confidence and Supply Agreement Premier Horgan and I signed in 2017, the BC Greens should communicate their intentions to government prior to the bill being called for debate. I’m not sure what the BC Greens were thinking, but I certainly understand why the BC NDP might not choose not to bring this bill forward for debate in light of the uncertainty created by the BC Green position on this file.
Today I attended a press conference hosted by the Canadian Geothermal Energy Association (CanGEA) announcing the release of a new report entitled: “Geothermal Energy: The Renewable and Cost Effective Alternative to Site C”. Immediately following the start of the press conference, we released the press statement below.
Over the last two years, I have repeatedly called on the government to explore innovative new opportunities in the clean technology sector. Most recently, I issued a press release calling on the provincial government to broaden BC Hydro’s scope to allow for the development of a geothermal power capacity in the province of British Columbia.
I’ve also expressed concern regarding the effect of burgeoning debt on our overall credit rating should Site C be approved. This is particularly relevant in light of the existence of more cost-effective alternatives.
Below is the text of our press release.
Media Statement: November 25, 2014
Geothermal more economical than Site C
For immediate release
Victoria, B.C. – Andrew Weaver, MLA for Oak Bay – Gordon Head and Deputy Leader of the B.C. Green Party welcomes the findings of the Canadian Geothermal Energy Association (CanGEA) report, released today, entitled “Geothermal Energy: The Renewable and Cost Effective Alternative to Site C”.
Key findings of the report include:
British Columbia has significant potential to develop geothermal and other renewable energy projects throughout the province. Such projects would distribute energy production where it is required and allow power to be brought online as demand increases.
“This is a timely report that clearly validates geothermal energy as a viable, more cost-effective alternative to Site C,” notes Andrew Weaver. “Geothermal projects are cheaper to build, provide power at a more economical rate, have a minimal environmental footprint, and generate more permanent jobs throughout the province.”
“In light of this new announcement, it’s clear that the government should not proceed with the Site C project at this time,” said Weaver. “There are simply too many cheaper alternatives available to protect the ratepayer. The clean energy sector is eagerly awaiting a more fiscally-responsible investment decision that would provide employment and development opportunities across the province.”
The full CanGEA report can be found at www.cangea.ca.
-30-
Media Contact
Mat Wright – Press Secretary, Andrew Weaver MLA
Mat.Wright@leg.bc.ca
Cell: 1 250 216 3382
Media Statement: July 9th, 2014
Weaver calls on BC Government to broaden BC Hydro’s scope to allow for production of geothermal power
For Immediate Release
Vancouver, B.C. – Today, Andrew Weaver, MLA for Oak Bay-Gordon Head and Deputy Leader of the B.C. Green Party, joined Gwen Johansson, the Mayor of Hudson’s Hope, as she released an independent report on the impacts of and the alternatives to the Site C project. Building on the findings of this report, Weaver is calling on the Provincial government to broaden BC Hydro’s scope to allow for the development of a geothermal power capacity in the province of British Columbia.
The Joint Review Panel (JRP) for the Site C dam released their report in early May. They found that the proposed project would result in significant and irreversible community and environmental impacts, and that there has not been sufficient assessment of the effects of rising electricity rates, advancing technology and energy conservation. They further noted that the accuracy of project cost estimates could not be confirmed because they did not have the information, time or resources. The Panel concluded that more work needed to be done and recommended a thorough review by the British Columbia Utilities Commission (BCUC).
The independent report released today by Mayor Johansson builds upon the findings of the JRP and proposes a number of cost effective alternatives to the Site C dam.
“It’s easy to believe that developing alternatives is always something that’s on the horizon,” said Weaver. “But with renewable resources like geothermal, British Columbia is actually falling further and further behind the rest of the world. If you look along the West coast of North America, and indeed throughout the entire Pacific Rim, the only jurisdiction that isn’t using its geothermal resources is British Columbia.”
Geothermal is only one of a number of different options identified in this report that are likely to produce power cheaper than Site C, while meeting the clean energy demands of this Province.
The Site C dam, if built, would be situated on the Peace River. It would produce 1,100 MW of power capacity and up to 5,100 GWh of electricity each year at an estimated cost of $7.9 billion dollars.
The construction of the Site C dam will flood 6,427 acres of Class 1 & 2 agricultural land, which includes the only Class 1 agricultural land north of Quesnel. The affected Treaty 8 Tribal Association has already expressed a number of serious concerns regarding the Site C dam proposal.
The Minister of Energy and Mines has stated that the decision as to whether or not Site C receives environmental certification will come sometime around September.
“The Province should take this opportunity to pause and explore whether geothermal energy could provide the same quantity of stable, reliable power, but in a more fiscally and environmentally prudent fashion and in a way that fosters partnerships with First Nations, while providing greater and more diverse job opportunities across the Province.” said Weaver.
Media Contact
Mat Wright – Press Secretary, Andrew Weaver MLA
mat.wright@leg.bc.ca